Technician Training - Competency Checklist
Learner:Coach:__ Date:____________
Setup and Understanding of Water-fed Pole
- [ ] Proper setup of Water Fed Pole System (Filtration System, Pump, hookup to pole and brush)
- [ ] Pole inspection, clamps are working and the pole is in good working condition.
- [ ] Brush inspection, brush/scrubber is in good working condition with no debris in bristles or on scrub pad.
- [ ] Able to operate pole independently at all levelsĀ (1st, 2nd, 3rd story)
- [ ] Different poles to operate - Tucker Mini, Tucker Mini-EXT, Tucker 40
- [ ] Calibrate TDS Meter
- [ ] TDS meter to read purity of water (12 TDS or lower)
Premium Exterior Window Cleaning - Water Fed Pole